Pathmark Associates Limited carried out a large number of projects under Government, Semi-Government, Private Sector and Donor Agencies.
So far, the company has executed 88 projects – 52 covering the whole of Bangladesh, 35 regionally within Bangladesh and 1 internationally (Bangkok) from 1986 to 2010.
The following number of projects were executed, in association with Pathmark Associates Limited, by the agencies shown below:
  1. GoB  - 50
  2. DANIDA-3
  3. Chittagong Port Authority - 3
  4. Directorate of Relief and Rehabilitation – 3
  5. Jatiya Granthakendra (National Book Center) - 3
  6. Rural Dev. Project-9 (RD-9)  - 3
  7. Mymensingh Aquaculture Extension Project – 2
  8. BSCIC-2
  9. UNDP – 1
10.  UN/ESCAP-1
11.  GTZ-1
12.  FBCCI-1
13.  Petrobangla -1
14.  LGED-1
15.  REB-1
16.  Mongla Port Authority-1
17.  BBS-1
18.  DWASA – 1
19.  Jamunan Multipurpose Bridge Authority-1
20.  Credit and Commerce Limited – 1
21.  Bangladesh Federation of Engineering Contractors – 1
22.  MEB Agro-Dairy Products Ltd.  – 1
23.  Enfants Du Monde (EDM) -1
24.  Directorate of Women Affairs – 1
25.  Jamuna Group, Dhaka -1
26.  Board of Intermediate & Secondary Education (BISE), Rajshahi -1
27.  Bangladesh Madrasah Education Board (BMEB) – 1
 
The funding agencies and the number of projects they financed are indicated below:
  1. GoB – 21
  2. ADB – 17
  3. DANIDA – 6
  4. World Bank -6
  5. Euro Com -3
  6. Chittagong Port Authority – 3
  7. CIDA – 3
  8. ODA  (UK)  -2
  9. GTZ - 2
10.  UNDP – 2
11.  UN / ESCAP – 2
12.  NBC – 2
13.  Asia Foundation / World Bank  - 1
14.  ESCAP / ILO – 1
15.  Credit and Commerce Limited – 1
16.  Bangladesh Federation of Engineering Contractors – 1
17.  MEB Agro Dairy – 1
18.  BSCIC – 1
19.  UNICEF – 1
20.  Mongla Port Authority – 1
21.  ADB / UNDP – 1
22.  NORAD – 1
23.  Dutch Gov. – 1
24.  Jamuna Group – 1
25.  FBCCI – 1
26.  KFW - 1

Project Title

Service Provided

Executing Agency

Period of Work

1. Economic Planning and Development

 

A study on Strengthening of Planning Process in Bangladesh

 

An appraisal of the historical development of the planning process in relation to the attainment of the objectives and goals of the planned development efforts for use in Fourth Five Year Plan and Perspective Plan of Bangladesh

 

Planning Commission, GOB

 

 

1989

1990

 

 

Study on All Agricultural Crops

 

Studied National income including input‑output, capital output and investment ‑ employment ratios of agricultural crops for use in Fourth Five - Year Plan and  Perspective Plan of Bangladesh.

 

Planning Commission, GOB

 

1989

1990

 

2. Macro Economic Analysis and Management 

 

A Survey on Small-scale and Cottage Industries in Bangladesh

 

A country wide  survey was conducted on a representative sample of cottage industries throughout Bangladesh. The Production volume, sales, raw materials, personnel, fixed assets, duties and taxes paid etc. were investigated. An estimate was made on the value added by the Small and Cottage Industries subsector to the national economy in Bangladesh.

 

Bangladesh Bureau of Statistics

 

 

1994

1995

 

Insurance Industry and Pension and Provident Fund Reform Project  (ADB TA No. 2915)

A team of consultants engaged in project implementation. The team included an insurance expert; pension and provident funds expert; actuary; and systems, organisation, and training experts. The team tried to recommend in creating an enabling, private sector oriented environment in the contractual saving sector, i.e. both insurance and provident funds, through a two-pronged approach.

 

 

Ministry of Finance, GOB

 

1999

 

3. Education 

Training Academy for Judicial Officers/ Project Appraisal

Studied desirability of setting up a separate training Institute for Judicial Officers.

Ministry of Works, GOB

 

1989

 

 

Survey of Higher Secondary Educational Institutions

 

Made intensive study into creating a system to provide data to implement policy reform in Higher Secondary Education to help improve decision making process and to enable continuous monitoring of the progress in the Higher Secondary Sector.

 

Ministry of Education, GOB.

 

 

 

1992

 

Review and Appraisal of Non-Formal Education Project of Dhaka Ahsania Mission

This appraisal study reviewed the target and achievements of the Non-Formal Education Project of Dhaka Ahsania Mission in Borguna District. The study also set the parameters for second phase of the project.

 

 

DANIDA

 

 

 

1993

 

 

Study on Evaluation of Satellite School Programme

 

 

 

 

 

 

The Government of Bangladesh introduced Satellite School Programme. These schools are 2 Class Schools.  The purpose of Satellite School is to bring out-of-school children of most disadvantageous areas to school.  A survey of 131 satellite schools and 131 mother schools spread all over Bangladesh was conducted, documents were studied and all the agencies concerned with the implementation of the programme from national to the school levels were interviewed. A report with recommendations on future course of action was submitted.

 

General Education Project, GOB

 

 

1994

 

Book Publication System in Bangladesh : Problems and Solutions

Book Publication System in Bangladesh suffers from problems of quality printing, marketing, availability of materials etc.

A sample survey was conducted in cities and towns where there are quite a good number of publishers. Respondents were Publishers, Book Sellers, Binders, Authors, Buyers and Officials of some major libraries. The study identified problems of book publication in Bangladesh and suggested appropriate measures to solve the problems.

Jatiya Granthakendra (National Book Centre)

 

1994

1995

 


Book Distribution System in Bangladesh : Problems and Solutions

Distribution of books in Bangladesh is carried out in an unscientific and unco-ordinated way.  The views of book sellers, publishers, authors and readers were collected.  Problems of book distribution were found out through analysis of data and measures for solution were suggested.

Jatiya Granthakendra (National Book Centre)

 

1994

1995

 

Evaluation of the project " Assistance to District and Thana level Public Libraries."

The performance of the project was evaluated. Strong and weak areas were identified and measures to enlarge services in any such future project were suggested.

Jatiya Granthakendra (National Book Center)

 

1995

1996

 

 

Reforms of Higher Secondary Education, Bangladesh (ADB Loan No. 1123-BAN(SF) /UNDP TA No. BGD/91/022/A/99)

 

The Higher Secondary Education system in Bangladesh needed to be improved to suit the requirements of the nation in the context of modern science, technology and business. The project aimed at bringing about revolutionary changes in the curricula, text book, examination system and information management system of Higher Secondary Education in Bangladesh. Pathmark in association with others in the consulting consortium provided expertise support to initiate strategic change in the overall system of operation and management of the Higher Secondary Education System.

 

Ministry of Education, GOB

 

1995

1998

Secondary Education Sector Development Project (ADB TA No. 2908)

 

Asian Development Bank funded a sector review in the light of major shifts of eight year basic education and four year secondary education as recommended by new education policy. Both international and domestic consultants were engaged to study recent trends in primary and secondary education. The study helped in developing a realistic project document for the secondary education sector.

 

Ministry of Education, GOB

 

1998

 

Establishing Base Line Data and Training Needs in the Field of Educational Planning under ESTEEM Project

ESTEEM aims to strengthen the Government’s capacity to deliver high quality primary education  through a sustainable, cost effective and equitable school system. It is designed to improve planning and management of all aspects of primary education in Bangladesh. An investigative study was conducted to achieve the two main objectives of  determining the planning process and also to determine training needs of decentralized planning personnel. The study had been carried out through participative approaches and it emphasized conducting indepth investigation in but representative sample of Districts and Thanas.

 

Primary and Mass Education Division,

GoB

 

1998

 

Institutional Development of  the Directorate of Non-formal Education Project (TA No. 2534-BAN)

The Consultants, Special Contract Staff and Specialist Subcontract Services, the company provided expertise support to (i) carry on extensive research works in the form of studying all relevant documents, administering questionnaires and interviewing concerned persons; (ii) develop appropriate materials, manuals, guides etc; and (iii) offer training to the key persons on the use of the above mentioned materials, manuals and guides. A comprehensive report covering all aspects was prepared and submitted to the employer on scheduled time.

 

Primary and  Mass Education Division,

GoB

 

1996- 2001

 

Second Non-Formal Education Project

(ADB TA No. 3465-BAN)

The consultants undertook extensive study of the existing NFE sector in Bangladesh, upon which recommendations for a second NFE project were based. The TA study carried out in a collaboration and consultative manner, securing input from relevant agencies such as DNFE, under the PMED, as well as district administrations involved in the total literacy movement, NGOs, community groups and learners. The consultants maintained liaison with NGO deliverers of NFE. After thorough study a project document was prepared.

 

Primary and  Mass Education Division,

GoB

 

2000- 2001

 

Secondary Education Sector Improvement Project (ADB Loan No. 1690-BAN)

 

The consultants identified four critical issues of secondary education in Bangladesh. These are: (i) weak policy and planning structures, (ii) poor quality, (iii) low internal and external efficiency, and (iii) limited access and equity and evaluated the present planning, implementation, evaluation and monitoring and management structure of secondary education.

 

Ministry of Education, GoB

 

2001-2006

 



 

Base-line Survey on Teacher Education under TQI-SEP

The services provided were: (1)  Mobilized the Survey Team – Professional and Support;  (2)  Processed and field – tested the survey instruments/ questionnaires/ supervisions; (3)  Recruited, trained, field-tested and deployed the field-survey enumerators /supervisors;  (4)  Made arrangement for data checking/editing/ analyzing and generating output tables;  (5)  Preparation of reports;  (6)  Organized workshops for eliciting comments for incorporation in reports.

 

Ministry of Education, GoB

 

2006-2007

 

 

Services to Evaluate Educational Institutions for Establishment, Recognition and Eligibility for Receiving MPO by the Non-Govt, Madrasahs (grade VI-XII class) under Bangladesh Madrasah Education Board (BMEB), Package B :  Chittagong Division and Package C :  Sylhet Division

The services provided by the Consultants were:  (i)  prepared a time-bound action plan for the services;  (ii)  conducted inspection of the aspirant institutions or required institutions for recognition and MPO subvention;  (iii)  resolved queries/observation with the procuring entity as and when required;  (iv)  collected information through spot visit; (v) conducted inspection of those educational institutions having MPO subvention for their continuation of government subsidy/subvention;  (vi)  prepared formats data sheets/questionnaires based on objective criteria;  (vii)  trained their own staff to effectively manage the task of inspection;  (viii)  prepared and submitted reports of inspection within the time frame set by the procuring entity.

 

Bangladesh Madrasah Education Board (BMEB)

 

2005-2007

 

 

 

 

 

4.  Project Planning and Implementation Management 

 

Effective Schools Through Enhanced Education Management (ESTEEM) :  Main Phase

 

In association of International Experts the Consultants provided the following services:  (i)  Designed the master training calendar for all training activities in the ESTEEM Project;  (ii)  ssisted on the management of ESTEEM training activities; (iii)  Assisted in establishing decentralized ESTEEM regional training structure; (iv) Prepared the complete management programme under the study; (v) Prepared full documentation on the process of facilitation and an evaluation of outcome of the management development to date; (vi)  Refined and streamlined existing monitoring and evaluation instruments used in the fields.

 

Primary and Mass Education Division,

GoB

 

 

1999-2005

 

Consultancy Services to Evaluate Educational Institutions for Establishment, Recognition and Eligibility for Receiving MPO (subvention) by the Non-Government Schools and Colleges (VI-XII) under Board of Intermediate & Secondary Education (BISE), Rajshahi

The services provided include (i)  prepared a time-bound action plan for the services; (ii)  prepared formats, data sheets/questionnaires based on objective criteria; (iii)  trained IIB’s own staff to effectively manage the task of inspection; (iv) conducted inspection of the aspirant institutions or required institutions for opening permission, academic recognition and MPO subvention; (v)  resolved queries/observation with the procuring entity as and when required; (vi)  collected information through spot-check-observation;  (vii)  conducted inspection of those educational institutions receiving MPO subvention for their eligibility for continuation of government subsidy/subvention;  (viii)  Prepared and submit reports of inspection within the time frame set by the procuring entity.

 

Board of Intermediate & Secondary Education (BISE), Rajshahi

 

2005-2006

5. HRD (Screening, testing, selection, recruitment, training, evaluation of personnel) 

 

Staff Development Reforms through Performance Evaluation and Job Analysis

 

 

The objectives of Rural Development Project 9 were changed as a result of changes in policy on rural development.  Pathmark Associates Ltd. conducted performance evaluation and job analysis of the existing staff (400 in number) and determined those who could be retained and those who should be replaced so that new objectives could be achieved.

 

Rural Dev. Project 9

(RD - 9)

 

 

1994

 

 

Consultancy services for supplying and supervising manpower for cluster facilitation teams, district teams and pilot teams.

 

 

Supplied over 400 employees of different categories to the SDF for running their various projects in social development of the rural poor in Bangladesh and supervised their mandated activities.

 

Social Development Foundation

 

2008-2010

 


6.  Poverty Alleviation & Productive Employment 

Evaluation of ESCAP/ILO non‑Farm Employment Promotion Project at Sakhipur and Narsingdi upazilas

 

Investigated into finding out alternatives to agriculture as a source of employment in the project area.

 

 

Directorate of Relief and Rehabilitation

 

 

 

1990

1991

 

 

Preparation of a new and extended Non‑Farm Employment Promotion Project

 

Prepared a new and extended Non‑Farm Employment Project covering all the four administrative Divisions of Bangladesh on the basis of the experience of the Pilot Project. In each Division two areas were selected for project operation.

 

Director of Relief and Rehabilitation

 

 

 

1991

 

 

 

Consultancy Work for the Regional Seminar on Non‑Farm Employment Project

 

A regional synthesis paper which was a background document for the regional seminar was prepared based "on the experiences gathered by the five participating countries in implementing the ESCAP‑ILO non‑farm employment project". The countries covered by the study were Bangladesh, Nepal, the Philippines, Srilanka and Thailand.

 

 

UN/ESCAP

 

 

 

1992

 

Baseline Survey for the SERWITCI Project

A baseline survey was conducted and the socio-economic parameters of targeted destitute women were investigated.

BSCIC

 

1995

1996

 

Evaluation of the Effectiveness of Bifurcation of Field Staff

The Rural Development Project - 9 is a poverty alleviation project undertaken for the most disadvantaged and the poorest segment of the population of the greater Rangpur district. To help ensure sustainability of the benefits derived by the poor people from the project, the responsibilities of the field staff have been divided into (a) Social Development and (b) Economic Development since 1994. This project deals with evaluation of the bifurcation activities.  An indepth investigation of the works done by the bifurcated field personnel was made.

 

Rural Dev. Project 9

(RD-9)

 

1996

 

A study on problems of graduation out of poverty and programme interventions : An analysis of strategic options

The study was to analyze the experiences of different poverty reduction programmes (both GO and NGO) on graduation of poor households out of poverty so that strategic options may be developed for poverty alleviation.

 

GED, Planning Commission, GoB

 

2006-2007

7.  Agriculture and Fisheries

Benchmark Socio-Economic and Fish Market Survey : Phase – II Thanas

The survey developed a framework which can be used to compare impact of the project on beneficiaries during post implementation evaluation.

Mymensingh Aquaculture Extension Project

 

1995

1996

 

Pilot Credit Activities in Mymensingh Aquaculture Extension Project, Phase - 1 Thanas

The Mymensingh Aquaculture Extension Project (MAEP) has been working for the development of Fisheries sector in six thanas of Mymensingh District. To ensure sustainability of the development activities a feasible Credit Model was planned to be developed.  Pathmark Associates Limited developed a feasible credit model with collaborative arrangements among beneficiaries, Bangladesh Krishi Bank and local NGOs.

 

Mymensingh Aquaculture Extension Project

 

 

 

1995

 

Conducting PRA/RRA Sessions under Northwest Region Integrated Agriculture Development Project

The primary objective of the project was to raise the rural incomes through the encouragement of high value agriculture, and marketing and agro-processing in the north-west regions. Considering the objectives the consultants (i) assessed the impact of completed and on-going projects; (ii) assessed the desirability of promoting sustainable developments; (iii) assessed the need to define clear institutional arrangements, task assignments, lines of authority, delegation & coordination between concerned agencies etc.

 

Department of Agricultural Extension, GoB

 

1999-2000

 

8.  Rural Development Issues 

Evaluation of Expanded Rural Social Services Project  Phase-IV

 

The Expanded Rural Social Services Project, Phase-IV has been in operation in 180 thanas throughout Bangladesh.  Pathmark evaluated the project and determined the strengths and weaknesses in organization and management of the project and suggested courses of action for ensuring sustainability of the benefits generated by the project.

 

Department

of Social Services, GOB

 

 

 

1995


 

Evaluation of DPHE/ UNICEF Rural Water Supply Project

Rural Water Supply Projects have been operational in Bangladesh since 1972.  The purpose of these projects are to help ensure supply of pure drinking water all over rural Bangladesh.  This study assessed the performance of the project implementation addressing the following issues : (a)  Technical issues;  (b)  Financial Management;  (c)  Social aspects and (d) Organizational aspects.

 

 

Department of Public Health

Engineering,

GOB

 

 

1995

Management Audit of the Rural Social Services Programme

Conducting indepth investigation on the structure, management system, work load, job character, efficiency, effectiveness and output of Thana Social Service Offices and determine the managerial productivity. The Consultants thoroughly studied how efficiently and economically the organizations resource have been used by Thana Office to render services. Criteria have been suggested to obtain better results in the future.

 

Enfants Du Monde(EDM)

 

1997

1998

 

Evaluation of Palli Pragati Prakalpa (2nd Revised) for the year 2007-2008

The services provided were :  (i)  Designed a study for evaluation of the overall performance of the project;  (ii)  Data collection instruments were developed, pre-tested and field survey was conducted among sample beneficiaries throughout the country;  (iii)  The micro-credit program was evaluated;  (iv)  Based on the analysis of data and observation of the real situation measures were suggested for sustainability of project benefits.

 

Bangladesh Rural Development Board (BRDB), GoB

 

2008

 

9. Rural Income and Welfare 

 

Appraising the Impact of Benefits Earned by the Contracting Groups

The RD-9 is a rural poverty alleviation project and RD-8 project is concerned with rural infrastructure development. The beneficiaries of RD-9 work are involved in infrastructure activities of RD-8. This project assessed the impact of income generating opportunities provided by RD-8 to RD-9 group members.  The company was involved in conducting field study. Information were collected from the field personnel and beneficiaries.

 

Rural Dev. Project 9

(RD-9)

 

1996

 

Study on "Employment Generation and Productivity in the Informal Sector in Bangladesh"

An in-depth study was conducted in sample informal organizations throughout Bangladesh. Steps for further expansion of employment opportunities were suggested.

Planning Commission, GOB

 

 

1995

1996

 

 

Baseline Survey of Bangladesh Poultry Sector Development Project

The study objectives were to identify (i) constraints of poultry industries; (ii) requirement of quality balanced feeding; (iii) requirement of quality feed mills; (iv) appropriate management aspect of poultry farms; (v) existing marketing facilities; and (vi) steps required for expansion of marketing. To meet the objectives a baseline survey was conducted to (i) identify the overall constraints in the poultry sector; (ii) assess the  requirement of quality poultry feeds; (iii) assess the potentiality of using sea-fishes as raw materials for preparing standard poultry feed; (iv) identify marketing facilities; and (v) recommend well balanced management services for the poultry sector development.

 

Department of Livestock Services,

GoB

 

 

 

1999-2000

 

 

Farm to Market Enterprise Development Project

Step was taken to access the needs of farmers and developed an innovative system for marketing farm products through demand driven activities so that farmers could develop entrepreneurial capability through better return on investment.  In this connection a country wide Baseline Survey  and a good number of PRA Sessions were conducted at village and Upazila level.

 

Department of Agricultural Extension (DAE), GoB

 

1998- 2001

 

Power Sector Financial Restructuring and Recovery Plan

The study included assessment of measures to restore credit worthiness while building the sector to meet the goals of universal coverage and high quality service in an efficient and sustainable manner.

 

Ministry of Power, Energy and Mineral Resources, GoB

 

2005-2006

Baseline Survey of Bangladesh Poultry Sector Development Project

The study objectives were to identify (i) constraints of poultry industries; (ii) requirement of quality balanced feeding; (iii) requirement of quality feed mills; (iv) appropriate management aspect of poultry farms; (v) existing marketing facilities; and (vi) steps required for expansion of marketing. To meet the objectives a baseline survey was conducted to (i) identify the overall constraints in the poultry sector; (ii) assess the  requirement of quality poultry feeds; (iii) assess the potentiality of using sea-fishes as raw materials for preparing standard poultry feed; (iv) identify marketing facilities; and (v) recommend well balanced management services for the poultry sector development.

Department of Livestock Services,

GoB

 

 

1999-2000

 

 

10.  Computer System 

Implementation of Computer Programmes for Optimization of Gas Transmission Networks in the Gas Sector

 

Informations have been collected from different operation centres of the Gas Transmission Networks & discussion with concerned persons. A computer programme was developed on Gas Transmission Network and some selected persons were offered training on it.

 

Petrobangla

 

 

1995

1996

 

11. Financial Management 

 

 

Action Plans based on SIFAD Task Force Report (BGD/90/022)

 

Draw up action plans based on the recommendations of the Task Force on Strengthening the Institutions for Food‑Assisted Development (SIFAD). The agencies covered in investigation were Planning Commission, Ministry of Relief and  Rehabilitation, Directorate of Relief and Rehabilitation, Local Government Engineering Division, Bangladesh Rural Development Board, Bangladesh Water Development Board.

 

 

ERD, Ministry of Finance, GOB.

 

 

 

1992

1993

1994

 

 

Capacity Building of the Securities and Exchange Commission and Selected Capital Market Institutions(ADB TA 3533-BAN)

 

The advisory TA aimed at strengthening the key institutions responsible for market regulation and market infrastructure support that are essential for a fair, transparent, and efficient domestic capital market. The TA built SEC’s capacity to effectively perform its role as market regulator and to audit corporate governance of listed companies and listed securities issuers. It helped Chittagong Stock Exchange (CSE) and Dhaka Stock Exchange (DSE) become more effective and efficient in discharging their responsibilities and CDBL to operate efficiently as a central depository of securities. The TA also organized and conducted training for capital market participants.

 

Ministry of  Finance,

GoB

 

 

2002 – 2003

12.   Environmental Planning, Environmental Management Training and Environmental Impact Study

 

Impact Evaluation Study of Shaheed Ziaur Rahman Medical College and 500 Bedded Hospital at Bogra (2001-2007)

The services provided by the company were :  (i)  Evaluate the quality of construction work accomplished through of  work mentioned against item in table above;  (ii)   Evaluate the quality of medical equipments installed under the project; (iii)  Evaluate whether the medical care services has been improved after project intervention;  (iv) Review the Annual Progress Reports prepared by Project which were ultimately placed in ECNC/NEC and comment on whether the Reports reflected the actual progress in physical work and financial expenditure up to 30 June of the relevant financial Year;  (v)  Organize one workshop in the Project Area to hold discussion, with Stake holders and beneficiaries;  (vi)  Organise a workshop/seminar will be organized by the firm to disseminate the study findings.

 

IMED, Ministry of Planning, GoB

 

2008-2009

 

 

 

Environmental Management Training Project

 

Researches/Surveys were conducted on developing necessary technical capabilities within the country to implement Environmental Impact Assessment (EIA) in an effective and meaningful manner. The major thrust of the project was to identify the most appropriate institutional arrangements for conducting training programmes on Environmental Impact Assessment.

 

Ministry of Environment and Forest, GOB.

 

 

 

 

1992

1993

 

 

 

 

Environmental Impact Assessment of MEB Agro-Dairy Plant

 

 

Investigated in detail the operational and environmental parameters of the MEB Agro Dairy Plant. Analyzed data on environmental issues and assessed the impact of operational parameters on environment. Preventive measures were identified and recommendations made on procedures to ensure protection of environment.

 

 

MEB Agro-Dairy Products Ltd.

 

 

 

 

1993

 

13.  Water Resources, Irrigation, Flood Control, Drainage Improvement and Erosion Control 

 

Gorai River Restoration Project

Conducted survey of Gorai River System. Ascertained volume of dredging needs of the river and accomplished study on the impact of Gorai River Waters for increased agricultural output of its downstream regions. Recommended to undertake a priority project for regular flow of the river and thereby to arrest environmental degradation.

 

Bangladesh Water Development Board, GoB

 

1999- 2002

14.  Health

Evaluation of ABC Sherpur Rural Eye Clinic & Rehabilitation Centre for the Visually Handicapped.

Assessed the quality of the diagnostic skills and curative services, the quality of the information, communication and educational services and coverage of the training programme of external staff.

 

 

DANIDA

 

 

 

1993

 

 

Feasibility Study to Establish a General Hospital of International Standard

The services provided include (i) Collection of related information through interview from different cities/towns; (ii) Analysis of the data collected through interview; (iii) Focus Group discussions with relevant people; (iv) Review of related documents on hospital Planning; (v) Investigation of cost items for the proposed hospital; and (vi) Finally, integration of all the results of investigation into a “Feasibility Study to Establish a General Hospital of  International Standard”.

 

Jamuna Group, Dhaka

 

2003-2004

15. Public Health Engineering

 

Waste Water Studies in Dhaka City. (Package # DS- 2 )

In association of International Consultant the services provided were:  (i)  Conduction of inventory of Tejgaon industrial area factories that produce wastewater; (ii)  Conduct Field survey of Tejgaon area to determine a suitable location of the treatment plant;  (iii)  Review the existing policy , regulatory and institutional framework that govern industrial discharge and standards for treated effluent quality and system for enforcement and monitoring;  (iv)  Review the state and capacity of constructed channels for transmission of the sewage to the CETP and propose any augmenting of channels;                (v)  Undertake a preliminary Environmental Assessment for the CETP

 

Dhaka Water Supply and Sewerage Authority (DWASA)

 

2006-2007

 

16.Technology Choice and Diffusion

Study on Administrative Procedure in connection with TADP (Tangail Agricultural Development Project).

 

Investigated into finding out a suitable administrative system to ensure efficient, cost effective and time saving implementation of the project.

 

 

German Technical Assistance (GTZ)

 

 

 

1989

 

17. Port and Shipping 

Documentation Work for the Traffic Department of Mongla Port Authority

The purpose of this project is to (i) update the manuals used in Traffic Management System of Mongla Port (ii) to develop job Description for officials of Traffic Department of Mongla Port (iii) to conduct an investigation of input forms and to design new forms and (iv) to provide on-the-job training to the officers and employees of Mongla Port Traffic Department of Mongla Port Authority. Detailed investigation were made into the existing system of operational realties of traffic functions of Mongla Port and Benapole Dry Port. Complete Manuals are developed to help increase managerial effectiveness of port traffic system management.

Mongla Port Authority

 

1995

1996

Updating of Present Traffic Manual of Chittagong Port

The purpose of this project was to develop a Traffic Manual incorporating into it the new technologies in port traffic management. The firm completed the following tasks to achieve the objectives of the study: i) Conducted in-depth study of the working procedures and relevant documents to find out strength and weaknesses of each area of investigation; ii) Updated the Traffic Manual of Chittagong Port in line with the introduction of new technologies in modern shipping management.

Chittagong Port Authority

 

 

1995

1996

 

Preparation of Container Manual for Chittagong Port Including Dhaka ICD.

The purpose of this project was to develop a comprehensive manual for container handling at Chittagong Port and Inland Container Depot in Dhaka. The firm completed successfully the following tasks:  i)  Suggested appropriate ways about how to bring further efficiency in the container operations between CPA and ICD, Dhaka; ii) Prepared a comprehensive manual incorporating various methods, procedures, formalities, etc. relating to container modeling and operation.

Chittagong Port Authority

 

 

1995

1996

 

Ports Upgrading Project (ADB TA No. 2863-BAN)

The project was formulated to fulfill the country’s most urgent requirements for improvement in efficiency and productivity in port operations. In association with the Foreign Experts the Local Consultants identified the problems and suggested steps to be taken to modernize Chittagong and Mongla Ports.

Ministry of Ports and Shipping, GOB

 

1997

1998

Bangladesh Port System Development Project :  Master Plan and Trade Facilitation Study.

 

The objective of the study include (i) to identify future role of Chittagong, Mongla and Dhaka ports in connection with cargo traffic; (ii) assess viabilities of development of those ports; and (iii) feasibility study for construction of jetties and multipurpose berths at the ports. To attain the objectives the consultants collected relevant documents and other pertinent information from all possible sources. The consultants performed all their activities upto the entire satisfaction of the project authority.

 

Chittagong Port Authority

 

1997-98

18. Infrastructure Development 

Construction of Roads, Culverts Bridges in different parts of the Country.

Supervised construction works of roads, culverts and bridges in the six districts covered by the project with a view to ensuring quality work.

 

 

Roads and Highways Dept., GOB

 

1986

1988

 

 

Study of the Bangladesh Construction Industry

 

Formulated a fair legislation and policy for betterment of the conditions of the country's contractors and recommended an association of contractors in order to attain a certain degree of efficiency needed for international bidding.

Planning Commission, GOB

 

 

 

1988

1989

 

 

Urban Sector Strategy (ADB TA)

The objective of the TA is to prepare a strategy guiding the Banks urban sector TA and lending programme in Bangladesh. To meet the objectives the consultants (i) reviewed and analysed the status and trends of urban development in the country; (ii) reviewed all previous programmes, project, studies of the Bank; (iii) conducted an up-to-date assessment of the constraints to and opportunities for urban development; (iv) developed framework in terms of policy & institutional reforms; and (v) identified interventions suitable for Bank assistance.

 

Local Government Engineering Department,

GoB

 

 

1999-2000

 

Develop a National Operational Plan (Maintenance Master Plan) for Primary Schools and Preparing of Maintenance Manual for the Maintenance of Structural Installation & Preservation of Different Machinery & Equipment

Initiative had been taken to develop data system covering district, thana and school level sources – on the basis of which the maintenance manual was developed – showing its effective operational plan. In the meantime, an working paper on Maintenance Plan of school building had been prepared. The working paper was discussed, and analysed in an workshop and valuable guidelines had come out which were helpful in preparing the maintenance plan.

 

Primary and  Mass Education Division,

GoB

 

2000- 2001

 

 

Feasibility Study of Dhaleswari River Bridges

 

 

Studied the feasibility of providing a technically and economically efficient crossing over the Dhaleswari River which bifurcates near Saidpur and flows eastward as two arms separated by an unstable char of about 500 m in width at the crossing with Dhaka‑Khulna road.

 

Roads and Highways Dept., GOB

 

 

 

1990

1991

 

 

19. Geological Survey and Investigation

 

Hard Rock Study in Chittagong and Chittagong Hill Tracts

 

Assessed the deposits of Hard rock in the greater Chittagong and Chittagong Hill Tracts Districts for the proposed Jamuna Multipurpose Bridge for use in the river training work. The activities involved detailed field survey, estimation of reserves, laboratory tests, diamond drilling, preparation of route maps, cost estimation etc.

 

 

Jamuna Multipurpose Bridge Authority

 

 

 

 

1989

1991

 

 

20. Industrial Strategy and Development

Market survey of Jute Diversified Products (JDPs) in major cities Dhaka, Chittagong, Rajshahi, Khulna, Barisal, Sylhet for ascertaining existing and potential market

The services provided to the client were: (i) assessed existing demand of jute diversified products at home, supply situation, competitors market opportunities and marketing chain; (ii)  assessed the existing demand and export volume in the overseas market and future market potential; (iii) identified prospective buyers of jute diversified products in different market segments in the domestic market.

 

Ministry of Textiles and Jute, GoB

 

2007

 

 


Feasibility Study on Banarashi Estate (Silk Industry)

Explored the possibility of setting up a Mini Industrial Estate for settlement of specialist Bangladeshi Weavers in handloom (Silk) industry.

Housing & Settlement Dept., GOB

 

1989

 

21. Private Sector development

Advisory Services for the Private Sector Unit (PSU) in Bangladesh

Carried out a comprehensive analysis of the political and economical system of Bangladesh to find out an administrative set up relevant to the establishment of a Private Sector Unit.

Planning Commission, GOB

 

 

1989

Feasibility Study of Private Sector Housing Development, Financing, Credit and Commercial Operation.

The study covered analysis of the macro‑economic environment in Bangladesh with special reference to the housing sector, market and financial analysis for the credit and Commerce including legal and organizational matters.

 

Credit and Commerce Ltd

 

 

1990

 

Review of the Policies on Access of the Private Sector to Technical Assistance

Reviewed the technical co‑operation support to the private sector in Bangladesh including existing policies of GOB and donors and recommend measures to promote access of  the private sector to the flow of technical assistance.

 

UNDP

 

 

1990

 

 

22. Forestry 

 

 

Study on Forestry

 

Examined situation of forestry and forestry based industry in general and  estimate input‑output ratio of different subsectors under the forestry sector for use in the preparation of the Fourth Five - Year Plan.

 

Planning Commission, GOB

 

1989

1990

 

23.Capacity Building 

 

Review of Activities of Bangladesh Federation of Engineering Contractors

 

Investigated into the need for a revision of the constitution of the federation of Engineering Contractors in the light of the recommendations of another study named "Construction Industry Study" conducted by Pathmark in association with ACER Freeman Fox and others.

 

Bangladesh Federation of Engineering Contractors

 

 

1990

 

Preparation of

Inventory of Equipment, Machinery & Transports Procured by BWDB.

This work involved collection of information of all equipment of Bangladesh Water Development Board, designing a suitable database and software to manage inventory data.

 

IMED, Ministry of Planning

 

 

 

1992

 

 

Institutional Development of the Directorate of Non-Formal Education (DNFE) : Final Evaluation

Provided Administrative Services to carryout the activities of the extended project period which is included: (i).Services of Finance Specialist, Core Trainers and Monitoring Associates;  (ii)  Holding Go-NGO meetings;  (iii)  Organizing foreign study tour of selected DNFE staff;  (iv)  Conducting the Final Evaluation and  (v)  Preparation of Project Completion Report.

 

Primary and  Mass Education Division,

GoB

 

2001

 

Second Primary Education Sector Project (ADB Loan No.  1521 BAN (SF)

The objectives of the project were to increase equitable access, develop quality of primary education, and strengthening the management, motoring and information system of primary education.  Studies were undertaken to assist the Government in the areas of enhancing quality of education and capacity building at NCTB. The interventions on quality and capacity building were employed in the following areas: (I) NCTB institutional development and capacity building, (ii)  curriculum and textbook improvement, (iii) textbook supply, and (iv)  student assessment.  Further, the team of specialists worked together to produce a cohesive, holistic and realizable project package to accomplish given objective and targets. Project had a component on development of learning materials on culture and life of tribal people.

 

Primary and  Mass Education Division,

GoB

 

1998-2002

 

SESIP Management Strengthening Component: Research Studies for Development and Pilot of a Model for Decentralized Management of Secondary Education (Study – 1 and Study – 2)

The services provided are: (1) review existing arrangements for planning, allocating, managing and monitoring the use of educational resources within the secondary education sector in Bangladesh, including a review of the present formal mechanisms for quality assurance;  (2)  assess the existing system for educational management in terms of stated government objectives;  (3)  assess the strengths and weaknesses of the current system for managing educational resources, with particular attention to accountability for the use of government funds;  (4)  propose a model for decentralized management of secondary education for piloting/training in three districts of one zone, including detailed guidelines and timelines for piloting/training;  (5)  Assess the capacity of government agencies and project management to absorb the workload related to the proposed arrangements.

 

Ministry of Education, GoB

 

2003-2004

 


 

Study on Services – Mode 4 Travel under the “Capacity Building of FBCCI” Project

The services rendered were:(i) Review of definition of  Mode-4  services by WTO, GATT; (ii)  Study of ILO’s international labour standards;  (iii) Identifying  short  comings  of  Mode-4;       (iv) Problems Bangladesh faces in supplying Mode-4 services through manpower export;      (v) Some suggestions on Standards Bangladesh should take on supply of services.

 

FBCCI

 

2007

 

 

“Strengthening the Policy Formulation Capabilities of MOPT” under Bangladesh Telecommunication TA Project

The services provided were: (a) Project Management support for the MOPT and BTRC in implementation of the IDA funded credit, to ensure that the project is implemented within time schedule and project costs;  (b)  Transfer of know how in project implementation and procurement to the staff in MOPT and BTRC;  and  (c)  Support to high-level BTTB restructuring taskforce in activities required for making recommendations to the GOB.

 

Ministry of Post and Tele-communication, GoB

 

2003-2007

 

24. Relief and Rehabilitation 

National Seminar on "Evaluation of the ESCAP/ILO Non‑Farm Employment Promotion Project."

Organized and implemented one seminar jointly sponsored by the Directorate of Relief & Rehabilitation, ESCAP and ILO. The main objective of the seminar was to assess the gains and the lessons learnt from the current projects.

 

Director of Relief and Rehabilitation

 

 

 

 

1991

25. Women in Development 

Research Studies in the Specified Areas for Assessing the Impact on the Society on Female Stipend Programme

Research studies were conducted to investigate the operational realities, community expectation and level of acceptance of the financial assistance provided to girl students. Measures to improve operational factors have been suggested.

 

Ministry of Education, GOB

 

1995

1996

 

Evaluation of the project “Community Based Services for the Poor Women and Children through NGO’s”

To study and report on the extent of success of the Project Programmes in attaining the objectives stated in the Project Document and the reason for failure in attaining the objectives. The Consultants Process Evaluation of the project through field survey with the help of questionnaires discussion with different categories of persons involved in the project implementation.

 

Directorate of Women Affairs

 

1997

1998

 

Design and Implementation of Pilot Scheme for Targeting Stipend Recipients under FSSAP

The main objective of this project was to spread education among the girls. Specifically it aimed at: (i) increasing number of girls enrolment in grades 6–10; (ii) increasing number of secondary education teacher; (iii) providing occupational skills training to school leaving girls; (iv) promoting supportive environment for girls education etc. In view of the objectives, the study consultants accomplished the task of (i) structuring suitable questionnaire; (ii) fielded survey teams in the sample thanas to collect useful data; (iii) prepared and submitted reports on dropout of grade five passed girls; and (iv) identified the role of guardians, parents, local elites to motivate girls ensuring their enrolment etc.

 

Ministry of Education,

GoB

 

 

1999-2000

 

 

Day Care Services for Children of Working Women

 

A Pilot Project with six Day Care Centres in areas with high concentration of women workers in Dhaka City was started under Ministry of Women's Affairs with financial assistance from DANIDA.  Pathmark Associates Limited conducted an Evaluation Study of the Project.

 

 

DANIDA

 

 

1994

 

 

Impact Evaluation Study on the “Rural Women Employment Creation Project”

The services provided by the company were :  (i)  Assessment of the implementation status of the major components of the project;  (ii)  Assessment of the impact of skill development training imparted to the rural poor women in terms of self-confidence and self-employment;  (iii)  Assessment of the credit management under the project;  (iv)  Assessment of impact of the project on socio-economic status of the rural poor women;  and (v)  Identification o the strengths and weaknesses of the project.

 

IMED, Ministry of Planning, GoB

 

 

 

2009-2010

 

 

 

Evaluative Study on Socio-Economic Impact  of  the Female Secondary Education Stipend Project (FESP)

The study assessed (1) the project contribution to educational outcomes in the project thanas compared to neighboring non-project thanas, (2) the project contribution in terms of increasing female age of marriage; (3) the extent to which the project contributes to delaying first marriage, lowering fertility rate, birth spacing, health and nutritional status of children; (4) extent to which the project created employment opportunity; and (5) to what extent the project has contributed to improving social status of female.

 

Ministry of Education, GoB

 

2000-2001

26. SME Development 

Survey of Garments Industries under Textile Sector Study

The study aimed at ascertaining (i) present production capability; (ii) quantity of production; (iii) man-power involved; (iv) existing technological facilities; (5) training facilities exists; (6) future textile policy decisions etc. Pathmark participated in the study undertaken by Dr. Martelli Associates of Switzerland. Under the study the selected researchers collected relevant data from 80 garments factories of the country and submitted a report.

Ministry of Textile, GOB

1998

Evaluation of "Development of Salt Industries in the Cox's Bazar Region" Project

 

The project's main activities are : (i) to increase production of Salt so that self sufficiency can be achieved  (ii) to determine optimum price of salt produced by farmers. The company conducted an evaluation study of the project.  Through the study strengths and weaknesses of salt production system were determined and courses of action were suggested to improve performance.

Bangladesh Small and Cottage Industries Corporation (BSCIC)

 

 

1995

27. Rural Electrification 

 

Survey on Rural Electrification

 

Analyze (i) the overall economic, financial and technical impacts of rural electrification programmes and (ii) the organizational, technical, operational and financial capability of the Rural Electrification Board, the agency executing the programme, and of the consumer-owned Electric Cooperatives.  A detailed investigation was made in some areas in which Rural Electrification Board (REB) provides electricity services.

Rural Electrification Board (REB)

 

 

1995

1996

28.  Local Government 

 

 

Action Plans based on SIFAD Task Force Report (BGD/90/022)

 

Draw up action plans based on the recommendations of the Task Force on Strengthening the Institutions for Food‑Assisted Development (SIFAD). The agencies covered in investigation were Planning Commission, Ministry of Relief and  Rehabilitation, Directorate of Relief and Rehabilitation, Local Government Engineering Division, Bangladesh Rural Development Board, Bangladesh Water Development Board.

 

 

ERD, Ministry of Finance, GOB.

 

 

 

1992

1993

1994

 

29. Disaster Management 

 

Preparation of Model Action Plan of Disaster Management Bureau

The project aimed at preparing model disaster action plan covering the disaster prone districts, thana and union level through Disaster Management committee. An investigative study was conducted and to achieve the objectives the study group (i) prepared Disaster Action Plans; (ii) collected information/requirements needed for preparation of disaster action plan; (iii) conducted thorough survey covering the disaster-prone districts, thana and union; and (iv) developed day-wise work plan for the model plan preparation group.

 

Disaster Management Bureau, GoB

 

 

1999-2000

 